Italy Temporary Training Facility
 2026/02/20

Italian Football Tent Case Study: Temporary Training Facility & Sports Structure Italy

I. Client Pain Points: The Training Facility Dilemma in a Historic City

A historic Italian football club faced a serious challenge—their training base in the city center needed renovation due to urban planning, and the first team and youth academy teams had to find temporary training grounds within 60 days. The club faced three core challenges:

  • Historic City Restrictions: The city where the club is located is subject to cultural heritage protection regulations, requiring temporary buildings to meet strict landscape requirements and not to affect the foundations of historical sites.

  • Professional Training Standards: The training grounds needed to meet the professional requirements of the Serie A league, including field size, lighting, locker rooms, and other supporting facilities.

  • Climate Adaptability: The local winters are rainy, and training must be conducted around the clock, which traditional open-air fields could not guarantee.

"We inspected several training grounds in the surrounding area, but they were either too far away, affecting player commutes, or their facilities were inadequate and could not meet the needs of a professional team," the club's operations director admitted. "We needed a professional football field solution that could be implemented quickly."


II. Solution: Customized Temporary Football Facility System

Key Turning Point: Our temporary sports facilities adopt a foundationless design, with all loads distributed through a counterweight system, causing no impact on the historical site.


Core Technical Parameters

Parameter CategoryStandard ConfigurationItalian Optimization
Field Dimensions105m × 68m (International Standard)Meets FIGC Certification Requirements
Tent Width68m clear spanCovers the entire field
Tent Length110mIncludes buffer zone outside sidelines
Eaves Height8mMeets golf ball flight trajectory requirements
Frame Material6082-T6 Aluminum AlloyCounterweight foundation for historical site area
Tent Characteristics950gsm PVC UV-resistant double-layer insulation-
Fire RatingEN 13501 Class BItalian Fire Service Certification
Lighting System500lux professional sports lightingFlicker-free LED (broadcast grade)
Changing Room Module8 independent changing roomsIncludes rehabilitation and physiotherapy areas
Installation Time45 daysIn coordination with archaeological monitoring schedules


Key Narrative Points

  • Week 1 Challenge: The Cultural Heritage Administration required weekly construction monitoring reports—we hired experts from the University of Bologna Archaeology Department, using micro-vibration monitoring to ensure zero impact on construction.

  • Cultural Adaptation: Incorporated the club's traditional colors into the tent's exterior, achieving visual unity with custom-printed tarpaulins.

  • Technological Integration: Integrated photovoltaic thin-film system providing 30% auxiliary power for lighting and ventilation, securing local energy subsidies.


III. Implementation Results: From Temporary to Benchmark

  • Approval Process: Completed three-level permits from Cultural Heritage Bureau, Municipal Government, and Fire Department within 28 working days

  • Installation and Construction: Completed all main structure and supporting facilities within 40 days

  • System Commissioning: Integrated commissioning of lighting, ventilation, and drainage systems within 5 days

  • Saves 85% of time compared to traditional buildings


IV. Core Advantages: Full-Cycle Value Guarantee

  • Material Standards: Aluminum profiles UNI EN 1090 certified; tent lifespan 10–12 years; connectors ISO 9227 C5-M

  • Process Control: Digital manufacturing ±1mm; pre-assembly testing 100%; on-site installation error<0.5%

  • Customization: 3 design solutions, full permit handling, local Italian engineers, emergency spare parts in Milan

  • After-Sales: Warranty 12 years (structure), 6 years (tent); biannual inspections; free technical upgrade solutions


V. Launching Your Italian Project

  • Professional Club Temporary Training Base

  • Youth Training Team Support Facilities

  • International Match Backup Training Fields

  • School Football Facility Upgrades

Get a Precise Solution

Please provide the following information for a customized Italian solution within 24 hours:

  • Site Location and Surrounding Environment

  • Usage Needs (Training/Match/Youth Training)

  • Term of Use and Expansion Plan

  • Local Special Requirements (if any)

Professional Consultation Channels: marketing@lingtong-structures.com

bottom_logo
TO CREATE A GREEN PREFABRICATED STRUCTURE ECO SYSTEM OF PRODUCTS AND SYSTEM!
bottom_logo2
  • Solution
  • Products
  • More Info
  • Contact Us
    Address:Lingtong Industrial Park, Wujin District, Changzhou City, Jiangsu Province, China 213102
    Follow Us
    bottom_20_ico1bottom_20_ico2bottom_20_ico3bottom_20_ico4
  • Get in Touch
    With a dedicated team of experienced engineers, designers, and production staff, we offer comprehensive one-stop services, from design and manufacturing to installation and after-sales support.
    Company Name
    *
    This field is required
    Email
    *
    This field is required
    Email format error
    Phone
    This field is required
    Telephone information is wrong!
    Message
    *
    This field is required
    Send Message